Kitchen renovation timeline in the UK

Typical range£7£30· working days

A UK kitchen renovation typically takes 2–4 weeks from strip-out to snagging. Budget flat-pack installations can finish in 7–10 working days; bespoke kitchens with quartz worktops stretch to 5–6 weeks because of templating and fabrication lead times.

Homeowners researching this typically also price up kitchen renovation cost in the uk, kitchen installation cost breakdown in the uk and kitchen fitting cost in the uk. For wider context, browse our bathroom pricing, boiler & heating costs and trades day rates.

Cost table

Indicative price ranges (UK, GBP)
ItemTypical range (GBP)
Strip-out & disposal
£1–£2days
Electrics first fix
£1–£2days
Plumbing first fix
£1–£2days
Plastering / making good
£1–£2days
Unit installation
£2–£4days
Worktop templating (stone)
£1–£2days
Worktop fabrication wait
£7–£14days
Worktop installation
£1–£2days
Tiling / splashback
£1–£2days
Appliance connection
£1–£2days
Decoration & snagging
£1–£2days

Labour costs

Kitchen fitting labour is the longest single trade, typically 6–10 days. Stone worktops add a separate templating and install visit.

Labour line items
ItemTypical range (GBP)
Kitchen fitter
£1,500–£4,000
Electrician
£450–£1,200
Plumber
£350–£900
Gas Safe engineer
£200–£600
Plasterer
£350–£800
Tiler
£250–£700

Materials costs

Material lead times are critical. Bespoke cabinet doors can take 4–6 weeks; stone worktops 2–3 weeks from template.

Materials & fittings
ItemTypical range (GBP)
Cabinets (8–10 units)
£1,800–£7,500
Worktop — laminate
£250–£600
Worktop — quartz / granite
£1,500–£4,500
Appliances (5-piece)
£1,500–£5,000
Sink & tap
£150–£700
Flooring (LVT or tile)
£30–£90/m²

Factors affecting cost in the UK

  • ·Worktop material — stone needs templating; laminate is same-day.
  • ·Cabinet type — flat-pack is faster than bespoke in-frame.
  • ·Layout changes — removing walls, moving gas or plumbing adds days.
  • ·Appliance delivery delays — especially integrated or premium brands.
  • ·Building control for structural wall removal (2–4 week approval).

Hidden & unexpected costs

  • ·Eating out for 2–4 weeks while the kitchen is unusable.
  • ·Temporary kitchen setup (microwave, kettle, mini-fridge).
  • ·Re-plastering after electrics if channelling is extensive.
  • ·Re-routing gas if the hob moves — Gas Safe certification included.
  • ·Replacing flooring in adjoining rooms after wall removal.

Ways to reduce cost

  • ·Order cabinets and appliances 6–8 weeks before start date.
  • ·Choose laminate or compact worktops to skip templating delays.
  • ·Keep the existing footprint to avoid plumbing and gas moves.
  • ·Book a single design-and-fit contractor to manage scheduling.
  • ·Plan the renovation for spring or autumn — trades are less busy.

Frequently asked questions

How long before I can cook in the new kitchen?
Usually by day 10–14 for flat-pack; day 18–25 for stone worktop kitchens. Appliance connection is the last step.
Why do stone worktops take so long?
The fitter templates after cabinets are in; the fabricator cuts off-site; then a second visit installs. This loop takes 10–18 days.
Can I live in the house during a kitchen renovation?
Yes, but it is inconvenient. Most families set up a temporary kitchen in the dining room or garage.
What is the shortest possible timeline?
7 working days for a simple flat-pack swap with no layout changes and laminate worktops.
Do kitchen fitters work weekends?
Some do at premium rates, but most prefer Monday–Friday. Weekend noise may also bother neighbours.